Tenant Improvements in Calgary: What Landlords & Businesses Need to Know
- Precedent Developments

- Aug 26
- 4 min read
Tenant improvements (TIs) turn a blank commercial space into a high-performing office, clinic, restaurant, or retail store. Success hinges on three things: clear scope, realistic budget/timeline, and tight coordination between tenant, landlord, designer, and contractor. The right partner de-risks code, costs, schedule, and handover.
What Are Tenant Improvements (and Why They Matter)?
Tenant improvements are the build-outs, alterations, or upgrades made inside a leased space to suit a specific business. Examples include new walls and doors, reception and meeting rooms, exam rooms, kitchens, accessible washrooms, lighting, HVAC balancing, and brand elements.
Common TI scenarios in Calgary:
Professional offices (law, finance, tech)
Medical/dental clinics and wellness studios
Restaurants, cafés, and food production
Retail showrooms and service uses
Fitness and specialty uses (sound/vibration control)
Who Pays? TI Allowance vs Turnkey vs Rent Abatement
1) TI Allowance (Most Common)
Landlord contributes a fixed dollar amount (often per square foot). Tenant manages design and construction. Upside: design control. Watchouts: overages and cash flow timing.
2) Turnkey Build
Landlord delivers a completed space per an agreed plan/spec. Upside: capital-light for tenant. Watchouts: fewer finish options, and “base standards” may not include all needs.
3) Rent Abatement / Blend & Extend
Instead of (or in addition to) cash, landlord offers free rent months or amortizes TI into base rent. Upside: smooths cash. Watchouts: total lease economics—model the NPV.
Tip: Define what counts as “TI-eligible” (e.g., design fees, permits, furniture power drops) in the offer to lease. Put it in the work letter.
Five Cost Drivers That Decide Your Budget

Base-Building Condition
Is the space warm shell (HVAC, power, sprinklers roughed in) or closer to cold shell? Are there existing washrooms? What’s the ceiling height after ductwork?
Use Type & Code Requirements
Clinics and restaurants require specialized mechanical/electrical, additional plumbing, grease interceptors, hoods/make-up air, sound control, or X-ray shielding—each adds cost.
Mechanical/Electrical Capacity
Panel size, available tonnage, fresh air rates, and sprinkler head layout directly affect budget and schedule.
Design Complexity & Finishes
Custom millwork, glass fronts, specialty lighting, acoustic ceilings, and brand features elevate experience—and cost. Prioritize where it matters most.
Schedule & Lead Times
Doors/glazing, HVAC units, specialty lighting, and millwork are long-lead items. Early selections = fewer delays.
Typical Budget Ranges (Guidance Only)
Actual costs vary by building, scope, and market conditions.
Standard Office Fit-Out: ~$60–$110 per sq ft
Clinic / Wellness: ~$140–$250 per sq ft
Retail: ~$120–$220 per sq ft
Restaurant / Food Service: ~$220–$400+ per sq ft
Include soft costs: design, engineering, permits, test-fits, and contingency (10–15%).
Timeline at a Glance
Programming & Test-Fit: 1–3 weeks
Design Development & Pricing: 3–6 weeks
Permits & Landlord Approval: 2–8+ weeks (in parallel where possible)
Construction: 6–20+ weeks (scope-dependent)
Commissioning & Handover: 1–2 weeks
Build your lease start date around a realistic critical path. Negotiate rent commencement tied to substantial completion, not a fixed calendar day.
Landlord Playbook: Protect the Asset, Speed the Lease
Set Building Standards: Approved door hardware, flooring classes, ceiling types, lighting specs—keeps quality consistent and lead times predictable.
Provide Accurate As-Builts: MEP drawings, capacity notes, and base-building specs reduce RFIs and change orders.
Pre-Build Spec Suites: Thoughtful layouts lease faster; let tenants customize finishes.
TI Handbook & Work Letter: Clear processes for approvals, insurance, site access, and after-hours work.
Future-Proof Services: Stacked risers, metered panels, extra sleeve locations—easier future re-tenanting.
Tenant Playbook: Negotiate Smart, Build Right
Scope the Must-Haves: Program rooms, adjacencies, accessibility, storage, power/data.
Clarify TI Eligibility: Include design fees, permits, low-voltage, signage rough-ins, and test-fits where possible.
Protect Cash Flow: Ask for progress draws on allowances and rent commencement tied to completion.
Own the Brand Moments: Reception, client areas, lighting, and sightlines—allocate budget where customers feel it.
Plan Operations Early: Acoustics, HVAC zoning, cleaning/storage, waste routes, and deliveries.
Code, Safety & Accessibility Essentials
Occupancy & Egress: Correct occupant load, exit widths, and door swing/clearances.
Fire & Sprinklers: Head relocations and updated coverage with new partitions.
Ventilation & Air Quality: Balance for comfort; health uses need higher fresh air.
Barrier-Free Design: Accessible washroom, turning radii, clearances, lever hardware, and counter heights.
Energy & Lighting: LED fixtures, smart controls, and daylight strategies lower OPEX.
Early involvement of design and engineering saves weeks—and thousands—in rework.
Restaurants & Clinics: Special Considerations
Restaurants: Grease interceptor sizing/location, hood & make-up air, odor control, gas line routing, washable surfaces, floor slopes to drains.
Clinics/Dental: Medical gases, sound isolation (STC targets), handwash stations, additional plumbing, X-ray shielding and certifications.
Value Engineering Without Compromise
Repeatable Details: Standardize door/frame types, tile formats, and millwork modules.
Ceiling Strategy: Combine open ceiling zones with acoustic islands to balance cost, speed, and sound.
Millwork Mix: One “hero” reception feature + durable standard casework elsewhere.
Lighting Layers: Use a base package, then accent where it counts (reception, product displays, seating).
How Precedent Developments De-Risks TI Projects
Design-Led, Budget-Informed
We start with test-fits and a costed concept so decisions are grounded in reality.
Integrated Delivery
Planning, branded interiors, engineering coordination, permitting, tendering, and construction project management—handled under one roof.
Schedule Discipline
Long-lead tracking, weekly site reports, milestone walkthroughs, and transparent change management.
Operational Finish
We commission systems, provide an O&M package, and hand over a space that’s ready for staff and customers—day one.
📞 Ready to Plan Your Tenant Improvement?
Whether you’re a landlord preparing spec suites or a tenant planning your first clinic, café, or office, we’ll align scope, budget, and schedule—and deliver a space that works.